|

| |
Introduction
The Well Planning II short course is designed to
complete the well planning procedure. Information previously presented in Well
Planning I is used as a basis for rig selection, cement program, mud program,
logging program and AFE generation.
What Will You Learn
-
To design the
drillstring for the planned well.
-
To describe the ideal
rig specifications for the well being planned.
-
To write a request to
bid letter to drilling contractors specifying minimum rig requirements.
-
To identify potential
problems on a hole section basis.
-
To write a general
well program.
-
To select the right
drilling fluid for the well being planned, and generate a complete mud
program.
-
To design and specify
a complete cementing program.
-
To generate a logging
program.
-
To estimate all
associated costs involved in drilling the planned well, and to generate an
AFE (Authorization for Expenditure) for the well.
What
Will You Take Away
-
Comprehension of the sequence
and procedure of well planning.
-
A complete example problem,
done by you, of a well plan.
-
The foundation on which your
future experience in well planning can successful build.
-
The confidence to take on and
complete any well planning assignment.
Who
Should Attend
Personnel involved in well planning on a day to
day basis and those who must execute the plan after its development. It
provides further training to those individuals who have previously completed
Well Planning.
Course Outline
|
I. |
Rig
Specifications |
|
|
A. |
Derrick
Requirements |
|
|
B. |
Substructure Specifications |
|
|
C. |
Drill Line
Requirements |
|
|
D. |
Drawworks
Requirements |
|
|
E. |
Auxiliary
Braking Systems |
|
|
F. |
Rotary
Requirements |
|
|
G. |
Pump
Requirements |
|
|
H. |
Power
Transmission |
|
|
I. |
Prime
Movers |
|
|
J. |
BOPS |
|
|
K. |
Choke
Manifold |
|
|
L. |
Mud Systems |
|
|
M. |
Air/Gas
System (Air/Gas Drilling) |
|
|
N. |
Auxiliary
Equipment |
|
II. |
Mud Program |
|
|
A. |
Purpose |
|
|
B. |
Types |
|
|
C. |
Fluid Flow |
|
|
D. |
Mud
Engineering |
|
III. |
Cementing
Program |
|
|
A. |
Purposes Of
Cementing |
|
|
B. |
Cement |
|
|
C. |
Cementing
Equipment |
|
|
D. |
Cementing
Operations |
|
|
E. |
Typical
Cement Jobs |
|
|
F. |
Logging
Program |
|
|
G. |
Exclusive
Drilling Application |
|
|
H. |
Wire Line
Logs |
|
|
I. |
Mud Logging |
|
|
J. |
Measurement
While Drilling (MWD) |
|
IV. |
Prognosis
Generation |
|
|
A. |
Geologic
Interpretation Of Prospect |
|
|
B. |
Offset
Control |
|
|
C. |
Projected
Characteristics Of Prospect |
|
|
D. |
Casing
Program |
|
|
E. |
Drill
String Design |
|
|
F. |
Rig
Requirements |
|
|
G. |
Mud Program |
|
|
H. |
Cementing
Program |
|
|
I. |
Logging
Program |
|
|
J. |
Directional
Control |
|
|
K. |
Auxiliary
Equipment |
|
|
L. |
Depth Days
Projections |
|
|
M. |
AFE
Preparation |
|
|
N. |
Record
Keeping |
|
Dates |
Locations |
Tuition Fee |
|
|
|
|
|
October 11
- 15, 2010 |
Lafayette,
Louisiana |
$ 3,000.00
USD |
|