I. |
Well Planning Section
|
|
|
A. |
Geology |
|
|
|
1. |
Sedimentation |
|
|
|
2. |
Stratigraphy |
|
|
|
3. |
Structure |
|
|
|
4. |
Origins Of Hydrocarbons
|
|
|
B. |
Formation Properties
|
|
|
|
1. |
Strengths |
|
|
|
2. |
Formation Pressure
|
|
|
|
3. |
Fracture Gradient
|
|
|
C. |
Drilling Problems |
|
|
|
1. |
Stuck Pipe |
|
|
|
2. |
Loss Of Circulation
|
|
|
|
3. |
Crooked Hole |
|
|
|
4. |
Drill String Failures
|
|
|
|
5. |
Fishing |
|
|
|
6. |
Abnormal Pressures
|
|
|
|
7. |
Abnormally High Pressures
|
|
|
|
8. |
Well Control |
|
|
D. |
Directional Planning
|
|
|
|
1. |
Straight Hole Drilling
|
|
|
|
2. |
Deviated Hole Drilling
|
|
|
|
3. |
Deviated Well Planning
Considerations |
|
|
|
4. |
Course Projections |
|
|
E. |
Casing Point Selection
|
|
|
|
1. |
Prospect Definition
|
|
|
|
2. |
Design Criteria
|
|
|
|
3. |
Legal Considerations
|
|
|
|
4. |
Production Considerations
|
|
|
|
5. |
Directional Considerations
|
|
|
|
6. |
Design Sequence
(Mechanical Considerations Only) |
|
|
|
7. |
Sizing Of Casing Strings
|
|
|
|
8. |
Special Considerations
|
|
|
F. |
Tubular Design
|
|
|
|
1. |
Basic Relationships
|
|
|
|
2. |
Design Criteria
|
|
|
|
3. |
Design Procedure
|
|
|
|
4. |
Examples |
|
|
G. |
Rig Specifications
|
|
|
|
1. |
Derrick Requirements
|
|
|
|
2. |
Substructure
Specifications |
|
|
|
3. |
Drill Line Requirements
|
|
|
|
4. |
Drawworks Requirements
|
|
|
|
5. |
Auxiliary Braking Systems
|
|
|
|
6. |
Rotary Requirements
|
|
|
|
7. |
Pump Requirements
|
|
|
|
8. |
Power Transmission
|
|
|
|
9. |
Prime Movers |
|
|
|
10. |
BOPS |
|
|
|
11. |
Choke Manifold
|
|
|
|
12. |
Mud Systems |
|
|
|
13. |
Air/Gas System (Air/Gas
Drilling) |
|
|
|
14. |
Auxiliary Equipment
|
|
|
H. |
Prognosis Generation
|
|
|
|
1. |
Geologic Interpretation Of
Prospect. |
|
|
|
2. |
Offset Control
|
|
|
|
3. |
Projected Characteristics
Of Prospect |
|
|
|
4. |
Casing Program
|
|
|
|
5. |
Drill String Design
|
|
|
|
6. |
Rig Requirements
|
|
|
|
7. |
Mud Program |
|
|
|
8. |
Cementing Program
|
|
|
|
9. |
Logging Program
|
|
|
|
10. |
Directional Control
|
|
|
|
11. |
Auxiliary Equipment
|
|
|
|
12. |
Depth Days Projections
|
|
|
|
13. |
AFE Preparation
|
|
|
|
14. |
Record Keeping
|
|
II. |
Drilling Systems Section
|
|
|
A. |
Drilling Fluids
|
|
|
|
1. |
Purpose |
|
|
|
2. |
Types |
|
|
|
3. |
Fluid Flow |
|
|
|
4. |
Mud Engineering
|
|
|
B. |
Drill String |
|
|
|
1. |
Function |
|
|
|
2. |
Components |
|
|
|
3. |
Bottom Hole Assembly
|
|
|
|
4. |
Loading Determinations
|
|
|
|
5. |
Drill String Related
Problems |
|
|
C. |
Casing Operations
|
|
|
|
1. |
Driving Casing
|
|
|
|
2. |
Jetting Casing
|
|
|
|
3. |
Casing Running Equipment
|
|
|
|
4. |
Casing Make Up
|
|
|
|
5. |
Casing Landing Practices
|
|
|
|
6. |
Casing Inspection
|
|
|
|
7. |
Well Heads |
|
|
|
8. |
Centralizer Standoff
Design |
|
|
|
9. |
Special Considerations
|
|
|
D. |
Cementing |
|
|
|
1. |
Cements |
|
|
|
2. |
Cementing Equipment
|
|
|
|
3. |
Cementing Accessories
|
|
|
|
4. |
Cement Operations
|
|
|
|
5. |
Additives |
|
|
|
6. |
Mud Removal |
|
|
|
7. |
Cement Slurry Design
|
|
|
|
8. |
Cement Job Design
|
|
|
|
9. |
Remedial Cementing
|
|
|
|
10. |
Cement Job Evaluation
|
|
|
E. |
Logging |
|
|
|
1. |
Exclusive Drilling
Application |
|
|
|
2. |
Wire Line Logs
|
|
|
|
3. |
Mud Logging |
|
|
|
4. |
Measurement While Drilling
(MWD) |
|
|
F. |
Directional Control
|
|
|
|
1. |
Surveying |
|
|
|
2. |
Bottom Hole Assembly
Utilization |
|
III. |
Drilling Optimization
Section |
|
|
A. |
Hydraulics |
|
|
|
1. |
Equivalent Circulating
Density |
|
|
|
2. |
Pressure Surge
Determination |
|
|
|
3. |
Cutting Transport
Phenomena |
|
|
|
4. |
Hole Face Cleaning
|
|
|
B. |
Determination Of Formation
Pressure |
|
|
|
1. |
Application |
|
|
|
2. |
Special Used |
|
|
|
3. |
Underbalanced Drilling |
|
|
|
4. |
Comparative ROP
Relationships |