Home Up Contact Us Mailing List Registration Form Site Map

 Teaching Outline

 

2010 Courses
Frequent Questions

I.

Well Planning Section

 

A.

Geology

 

 

1.

Sedimentation

 

 

2.

Stratigraphy

 

 

3.

Structure

 

 

4.

Origins Of Hydrocarbons

 

B.

Formation Properties

 

 

1.

Strengths

 

 

2.

Formation Pressure

 

 

3.

Fracture Gradient

 

C.

Drilling Problems

 

 

1.

Stuck Pipe

 

 

2.

Loss Of Circulation

 

 

3.

Crooked Hole

 

 

4.

Drill String Failures

 

 

5.

Fishing

 

 

6.

Abnormal Pressures

 

 

7.

Abnormally High Pressures

 

 

8.

Well Control

 

D.

Directional Planning

 

 

1.

Straight Hole Drilling

 

 

2.

Deviated Hole Drilling

 

 

3.

Deviated Well Planning Considerations

 

 

4.

Course Projections

 

E.

Casing Point Selection

 

 

1.

Prospect Definition

 

 

2.

Design Criteria

 

 

3.

Legal Considerations

 

 

4.

Production Considerations

 

 

5.

Directional Considerations

 

 

6.

Design Sequence (Mechanical Considerations Only)

 

 

7.

Sizing Of Casing Strings

 

 

8.

Special Considerations

 

F.

Tubular Design

 

 

1.

Basic Relationships

 

 

2.

Design Criteria

 

 

3.

Design Procedure

 

 

4.

Examples

 

G.

Rig Specifications

 

 

1.

Derrick Requirements

 

 

2.

Substructure Specifications

 

 

3.

Drill Line Requirements

 

 

4.

Drawworks Requirements

 

 

5.

Auxiliary Braking Systems

 

 

6.

Rotary Requirements

 

 

7.

Pump Requirements

 

 

8.

Power Transmission

 

 

9.

Prime Movers

 

 

10.

BOPS

 

 

11.

Choke Manifold

 

 

12.

Mud Systems

 

 

13.

Air/Gas System (Air/Gas Drilling)

 

 

14.

Auxiliary Equipment

 

H.

Prognosis Generation

 

 

1.

Geologic Interpretation Of Prospect. 

 

 

2.

Offset Control

 

 

3.

Projected Characteristics Of Prospect

 

 

4.

Casing Program

 

 

5.

Drill String Design

 

 

6.

Rig Requirements

 

 

7.

Mud Program

 

 

8.

Cementing Program

 

 

9.

Logging Program

 

 

10.

Directional Control

 

 

11.

Auxiliary Equipment

 

 

12.

Depth Days Projections

 

 

13.

AFE Preparation

 

 

14.

Record Keeping

II.

Drilling Systems Section

 

A.

Drilling Fluids

 

 

1.

Purpose

 

 

2.

Types

 

 

3.

Fluid Flow

 

 

4.

Mud Engineering

 

B.

Drill String

 

 

1.

Function

 

 

2.

Components

 

 

3.

Bottom Hole Assembly

 

 

4.

Loading Determinations

 

 

5.

Drill String Related Problems

 

C.

Casing Operations

 

 

1.

Driving Casing

 

 

2.

Jetting Casing

 

 

3.

Casing Running Equipment

 

 

4.

Casing Make Up

 

 

5.

Casing Landing Practices

 

 

6.

Casing Inspection

 

 

7.

Well Heads

 

 

8.

Centralizer Standoff Design

 

 

9.

Special Considerations

 

D.

Cementing

 

 

1.

Cements

 

 

2.

Cementing Equipment

 

 

3.

Cementing Accessories

 

 

4.

Cement Operations

 

 

5.

Additives

 

 

6.

Mud Removal

 

 

7.

Cement Slurry Design

 

 

8.

Cement Job Design

 

 

9.

Remedial Cementing

 

 

10.

Cement Job Evaluation

 

E.

Logging

 

 

1.

Exclusive Drilling Application

 

 

2.

Wire Line Logs

 

 

3.

Mud Logging

 

 

4.

Measurement While Drilling (MWD)

 

F.

Directional Control

 

 

1.

Surveying

 

 

2.

Bottom Hole Assembly Utilization

III.

Drilling Optimization Section

 

A.

Hydraulics

 

 

1.

Equivalent Circulating Density

 

 

2.

Pressure Surge Determination

 

 

3.

Cutting Transport Phenomena

 

 

4.

Hole Face Cleaning

 

B.

Determination Of Formation Pressure

 

 

1.

Application

 

 

2.

Special Used

 

 

3.

Underbalanced Drilling

 

 

4.

Comparative ROP Relationships


| Home | Contact Us | Courses | Mailing List | Questions | Registration | Site Map |


Contact the webmaster with questions or comments about this web site.
Copyright © 2004 Prentice Training Company Inc
Last modified: September 16, 2009